Hatton RD over EL68 Wasteway 608+83.97

Fair

Adams County, Washington · 02.08 MI E SR17 · Structure no. 083996000000000

Built
1952
73 years old, rebuilt 1970
Condition
Fair
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
52 ft
3 main spans
Daily traffic
166
2018 count
Owner
County
County Highway Agency

About this bridge

Hatton RD over EL68 Wasteway 608+83.97 is a prestressed concrete stringer/multi-beam or girder carrying Hatton RD over EL68 Wasteway 608+83.97 in Adams County, Washington. It was built in 1952 and reconstructed in 1970, so it is 73 years old, older than the Washington average of 49.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 166 vehicles a day, roughly 6% of them trucks, projected to reach 207 by 2039. The structure is 52 ft (15.8 m) long and 28 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesHatton RD
CrossesEL68 Wasteway 608+83.97
Location02.08 MI E SR17
RouteCounty Highway 22121
Coordinates46.76655, -119.09094
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating45.7 US tons
Inventory rating35.1 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans3
Design loadHS 20
Structure length52 ft (15.8 m)
Longest span17 ft (5.2 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic166 (2018)
Projected traffic207 by 2039
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2.2 million (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Hatton RD over EL68 Wasteway 608+83.97 built?

It was built in 1952, making it 73 years old in 2025. It was reconstructed in 1970.

What condition is Hatton RD over EL68 Wasteway 608+83.97 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Hatton RD over EL68 Wasteway 608+83.97 carry?

About 166 vehicles per day (2018 count), of which roughly 6% are trucks.

How long is Hatton RD over EL68 Wasteway 608+83.97?

The structure is 52 ft (15.8 m) long with a longest span of 17 ft (5.2 m) and a deck 28 ft wide.

Who owns Hatton RD over EL68 Wasteway 608+83.97?

It is owned by the County Highway Agency.