TR 03 FAS 125 over S. Br. Williams River
FairPosted for loadWindsor County, Vermont · 0.6 MI S Jct. VT.11 · Structure no. 200125000614072
- Built
- 1950
- 75 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 59 ft
- 1 main span
- Daily traffic
- 680
- 2017 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
TR 03 FAS 125 over S. Br. Williams River is a steel stringer/multi-beam or girder carrying TR 03 FAS 125 over S. Br. Williams River in Windsor County, Vermont. It was built in 1950, so it is 75 years old, older than the Vermont average of 60.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 680 vehicles a day, roughly 6% of them trucks, projected to reach 714 by 2027. The structure is 59 ft (18 m) long and 27 ft wide. If it were closed, the detour would be 18 mi (29 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was TR 03 FAS 125 over S. Br. Williams River built?
It was built in 1950, making it 75 years old in 2025.
What condition is TR 03 FAS 125 over S. Br. Williams River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does TR 03 FAS 125 over S. Br. Williams River carry?
About 680 vehicles per day (2017 count), of which roughly 6% are trucks.
How long is TR 03 FAS 125 over S. Br. Williams River?
The structure is 59 ft (18 m) long with a longest span of 57 ft (17.4 m) and a deck 27 ft wide.
Who owns TR 03 FAS 125 over S. Br. Williams River?
It is owned by the Town or Township Highway Agency.