I 00089 Ml over I 89 over WR&NECR&107
FairWindsor County, Vermont · 0.2 MI S Exit 3 · Structure no. 200089026N14162
- Built
- 1968
- 57 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 917 ft
- 6 main spans
- Daily traffic
- 15,800
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
I 00089 Ml over I 89 over WR&NECR&107 is a steel continuous stringer/multi-beam or girder carrying I 00089 Ml over I 89 over WR&NECR&107 in Windsor County, Vermont. It was built in 1968, so it is 57 years old, younger than the Vermont average of 60.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,800 vehicles a day, roughly 13% of them trucks, projected to reach 16,590 by 2028. The structure is 917 ft (279.5 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 00089 Ml over I 89 over WR&NECR&107 built?
It was built in 1968, making it 57 years old in 2025.
What condition is I 00089 Ml over I 89 over WR&NECR&107 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does I 00089 Ml over I 89 over WR&NECR&107 carry?
About 15,800 vehicles per day (2018 count), of which roughly 13% are trucks.
How long is I 00089 Ml over I 89 over WR&NECR&107?
The structure is 917 ft (279.5 m) long with a longest span of 225 ft (68.6 m) and a deck 36 ft wide.
Who owns I 00089 Ml over I 89 over WR&NECR&107?
It is owned by the State Highway Agency.