C3092 over 1st Branch White R.
PoorPosted for loadWindsor County, Vermont · @ JCT W VT110 · Structure no. 101416002914161
- Built
- 1919
- 106 years old, rebuilt 1999
- Condition
- Poor
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 60 ft
- 1 main span
- Daily traffic
- 20
- 2019 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
C3092 over 1st Branch White R. is a wood or timber stringer/multi-beam or girder carrying C3092 over 1st Branch White R. in Windsor County, Vermont. It was built in 1919 and reconstructed in 1999, so it is 106 years old, older than the Vermont average of 60.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 20 vehicles a day, roughly 2% of them trucks, projected to reach 21 by 2029. The structure is 60 ft (18.3 m) long and 16 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was C3092 over 1st Branch White R. built?
It was built in 1919, making it 106 years old in 2025. It was reconstructed in 1999.
What condition is C3092 over 1st Branch White R. in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in August 2024.
How much traffic does C3092 over 1st Branch White R. carry?
About 20 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is C3092 over 1st Branch White R.?
The structure is 60 ft (18.3 m) long with a longest span of 56 ft (17.1 m) and a deck 16 ft wide.
Who owns C3092 over 1st Branch White R.?
It is owned by the Town or Township Highway Agency.