C3118 over Williams River
FairPosted for loadWindsor County, Vermont · 0.01 MI to JCT W VT103 · Structure no. 101407005314071
- Built
- 1940
- 85 years old, rebuilt 2002
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 43 ft
- 1 main span
- Daily traffic
- 20
- 2019 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
C3118 over Williams River is a steel stringer/multi-beam or girder carrying C3118 over Williams River in Windsor County, Vermont. It was built in 1940 and reconstructed in 2002, so it is 85 years old, older than the Vermont average of 60.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 20 vehicles a day, roughly 2% of them trucks, projected to reach 21 by 2029. The structure is 43 ft (13.1 m) long and 16 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was C3118 over Williams River built?
It was built in 1940, making it 85 years old in 2025. It was reconstructed in 2002.
What condition is C3118 over Williams River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does C3118 over Williams River carry?
About 20 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is C3118 over Williams River?
The structure is 43 ft (13.1 m) long with a longest span of 41 ft (12.5 m) and a deck 16 ft wide.
Who owns C3118 over Williams River?
It is owned by the Town or Township Highway Agency.