C3044 over Pinney Hollow Brook
FairWindsor County, Vermont · 0.2 MI JCT TH 44 +VT100A · Structure no. 101405002814051
- Built
- 1939
- 86 years old, rebuilt 1990
- Condition
- Fair
- inspected September 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 34 ft
- 1 main span
- Daily traffic
- 100
- 2019 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
C3044 over Pinney Hollow Brook is a prestressed concrete tee beam carrying C3044 over Pinney Hollow Brook in Windsor County, Vermont. It was built in 1939 and reconstructed in 1990, so it is 86 years old, older than the Vermont average of 60.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 2% of them trucks, projected to reach 105 by 2029. The structure is 34 ft (10.4 m) long and 20 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was C3044 over Pinney Hollow Brook built?
It was built in 1939, making it 86 years old in 2025. It was reconstructed in 1990.
What condition is C3044 over Pinney Hollow Brook in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does C3044 over Pinney Hollow Brook carry?
About 100 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is C3044 over Pinney Hollow Brook?
The structure is 34 ft (10.4 m) long with a longest span of 31 ft (9.4 m) and a deck 20 ft wide.
Who owns C3044 over Pinney Hollow Brook?
It is owned by the Town or Township Highway Agency.