C3067 over North River
PoorPosted for loadWindham County, Vermont · 0.2 MI JCT TH 62 & VT112 · Structure no. 101321004713211
- Built
- 1919
- 106 years old
- Condition
- Poor
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 34 ft
- 1 main span
- Daily traffic
- 30
- 2019 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
C3067 over North River is a steel stringer/multi-beam or girder carrying C3067 over North River in Windham County, Vermont. It was built in 1919, so it is 106 years old, older than the Vermont average of 60.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 30 vehicles a day, roughly 2% of them trucks, projected to reach 32 by 2029. The structure is 34 ft (10.4 m) long and 14 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was C3067 over North River built?
It was built in 1919, making it 106 years old in 2025.
What condition is C3067 over North River in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in April 2024.
How much traffic does C3067 over North River carry?
About 30 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is C3067 over North River?
The structure is 34 ft (10.4 m) long with a longest span of 32 ft (9.8 m) and a deck 14 ft wide.
Who owns C3067 over North River?
It is owned by the Town or Township Highway Agency.