C3001 over Rake Branch Deerfield R
FairPosted for loadWindham County, Vermont · 4.9 MI to JCT W VT9 · Structure no. 101315000213151
- Built
- 1919
- 106 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 45 ft
- 1 main span
- Daily traffic
- 30
- 2019 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
C3001 over Rake Branch Deerfield R is a steel stringer/multi-beam or girder carrying C3001 over Rake Branch Deerfield R in Windham County, Vermont. It was built in 1919, so it is 106 years old, older than the Vermont average of 60.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 30 vehicles a day, roughly 2% of them trucks, projected to reach 32 by 2029. The structure is 45 ft (13.7 m) long and 16 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was C3001 over Rake Branch Deerfield R built?
It was built in 1919, making it 106 years old in 2025.
What condition is C3001 over Rake Branch Deerfield R in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does C3001 over Rake Branch Deerfield R carry?
About 30 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is C3001 over Rake Branch Deerfield R?
The structure is 45 ft (13.7 m) long with a longest span of 38 ft (11.6 m) and a deck 16 ft wide.
Who owns C3001 over Rake Branch Deerfield R?
It is owned by the Town or Township Highway Agency.