US Bridges

C3020 over Minister Brook

FairPosted for load

Washington County, Vermont · 0.1 MI to JCT W CL3 TH3 · Structure no. 101220002812201

Built
1994
31 years old
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
27 ft
1 main span
Daily traffic
30
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C3020 over Minister Brook is a steel stringer/multi-beam or girder carrying C3020 over Minister Brook in Washington County, Vermont. It was built in 1994, so it is 31 years old, younger than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 30 vehicles a day, roughly 2% of them trucks, projected to reach 32 by 2029. The structure is 27 ft (8.2 m) long and 16 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesC3020
CrossesMinister Brook
Location0.1 MI to JCT W CL3 TH3
StateVermont
Coordinates44.39491, -72.58868
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry8: Equal to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating17 US tons
Inventory rating11 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1
Design loadUnknown
Structure length27 ft (8.2 m)
Longest span25 ft (7.6 m)
Deck width16 ft (4.9 m)
Roadway width16 ft (4.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2019)
Projected traffic32 by 2029
Trucks2%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$201,000 (2020 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was C3020 over Minister Brook built?

It was built in 1994, making it 31 years old in 2025.

What condition is C3020 over Minister Brook in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does C3020 over Minister Brook carry?

About 30 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is C3020 over Minister Brook?

The structure is 27 ft (8.2 m) long with a longest span of 25 ft (7.6 m) and a deck 16 ft wide.

Who owns C3020 over Minister Brook?

It is owned by the Town or Township Highway Agency.