US Bridges

C3ARM over Thatcher Brook

Fair

Washington County, Vermont · 0.04 MI to JCT W Union · Structure no. 101218003312181

Built
1960
65 years old
Condition
Fair
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
49 ft
1 main span
Daily traffic
300
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C3ARM over Thatcher Brook is a steel stringer/multi-beam or girder carrying C3ARM over Thatcher Brook in Washington County, Vermont. It was built in 1960, so it is 65 years old, older than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 300 vehicles a day, roughly 2% of them trucks, projected to reach 315 by 2029. The structure is 49 ft (14.9 m) long and 42 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesC3ARM
CrossesThatcher Brook
Location0.04 MI to JCT W Union
StateVermont
Coordinates44.34104, -72.75765
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length49 ft (14.9 m)
Longest span47 ft (14.3 m)
Deck width42 ft (12.7 m)
Roadway width39 ft (12 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2019)
Projected traffic315 by 2029
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$763,000 (2020 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was C3ARM over Thatcher Brook built?

It was built in 1960, making it 65 years old in 2025.

What condition is C3ARM over Thatcher Brook in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does C3ARM over Thatcher Brook carry?

About 300 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is C3ARM over Thatcher Brook?

The structure is 49 ft (14.9 m) long with a longest span of 47 ft (14.3 m) and a deck 42 ft wide.

Who owns C3ARM over Thatcher Brook?

It is owned by the Town or Township Highway Agency.