US Bridges

C2011 over East Creek

Good

Rutland County, Vermont · 0.08 MI to JCT W US7 · Structure no. 101120000911201

Built
1950
75 years old, rebuilt 2010
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
99 ft
1 main span
Daily traffic
800
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C2011 over East Creek is a steel stringer/multi-beam or girder carrying C2011 over East Creek in Rutland County, Vermont. It was built in 1950 and reconstructed in 2010, so it is 75 years old, older than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 800 vehicles a day, roughly 2% of them trucks, projected to reach 840 by 2029. The structure is 99 ft (30.2 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesC2011
CrossesEast Creek
Location0.08 MI to JCT W US7
StateVermont
Coordinates43.63371, -72.97766
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadH 15
Structure length99 ft (30.2 m)
Longest span97 ft (29.6 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic800 (2019)
Projected traffic840 by 2029
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$951,000 (2020 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was C2011 over East Creek built?

It was built in 1950, making it 75 years old in 2025. It was reconstructed in 2010.

What condition is C2011 over East Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does C2011 over East Creek carry?

About 800 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is C2011 over East Creek?

The structure is 99 ft (30.2 m) long with a longest span of 97 ft (29.6 m) and a deck 26 ft wide.

Who owns C2011 over East Creek?

It is owned by the Town or Township Highway Agency.