US Bridges

C3014 over Lake Bomoseen

Fair

Rutland County, Vermont · 0.25 MI to JCT W VT30 · Structure no. 101103003811031

Built
1962
63 years old
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
84 ft
1 main span
Daily traffic
200
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C3014 over Lake Bomoseen is a steel stringer/multi-beam or girder carrying C3014 over Lake Bomoseen in Rutland County, Vermont. It was built in 1962, so it is 63 years old, older than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 200 vehicles a day, roughly 2% of them trucks, projected to reach 210 by 2029. The structure is 84 ft (25.6 m) long and 29 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesC3014
CrossesLake Bomoseen
Location0.25 MI to JCT W VT30
StateVermont
Coordinates43.67754, -73.19824
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating92 US tons
Inventory rating55 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length84 ft (25.6 m)
Longest span82 ft (25 m)
Deck width29 ft (8.8 m)
Roadway width23 ft (7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2019)
Projected traffic210 by 2029
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$903,000 (2020 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was C3014 over Lake Bomoseen built?

It was built in 1962, making it 63 years old in 2025.

What condition is C3014 over Lake Bomoseen in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does C3014 over Lake Bomoseen carry?

About 200 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is C3014 over Lake Bomoseen?

The structure is 84 ft (25.6 m) long with a longest span of 82 ft (25 m) and a deck 29 ft wide.

Who owns C3014 over Lake Bomoseen?

It is owned by the Town or Township Highway Agency.