US Bridges

C3090 over Thayer Brook

FairPosted for load

Orange County, Vermont · 0.2 MI JCT Brook ST · Structure no. 100909005109091

Built
1928
97 years old
Condition
Fair
inspected October 2023
Type
Tee Beam
Concrete
Length
39 ft
1 main span
Daily traffic
100
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C3090 over Thayer Brook is a concrete tee beam carrying C3090 over Thayer Brook in Orange County, Vermont. It was built in 1928, so it is 97 years old, older than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 100 vehicles a day, roughly 2% of them trucks, projected to reach 105 by 2029. The structure is 39 ft (11.9 m) long and 23 ft wide. If it were closed, the detour would be 11.2 mi (18 km).

CarriesC3090
CrossesThayer Brook
Location0.2 MI JCT Brook ST
StateVermont
Coordinates43.92388, -72.6809
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating29 US tons
Inventory rating17 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length39 ft (11.9 m)
Longest span36 ft (11 m)
Deck width23 ft (7 m)
Roadway width21 ft (6.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2019)
Projected traffic105 by 2029
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was C3090 over Thayer Brook built?

It was built in 1928, making it 97 years old in 2025.

What condition is C3090 over Thayer Brook in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does C3090 over Thayer Brook carry?

About 100 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is C3090 over Thayer Brook?

The structure is 39 ft (11.9 m) long with a longest span of 36 ft (11 m) and a deck 23 ft wide.

Who owns C3090 over Thayer Brook?

It is owned by the Town or Township Highway Agency.