US Bridges

C2007 over Gold Brook

Fair

Lamoille County, Vermont · 0.2 MI to JCT W VT100 · Structure no. 100808005008081

Built
1971
54 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
59 ft
1 main span
Daily traffic
1,500
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C2007 over Gold Brook is a steel stringer/multi-beam or girder carrying C2007 over Gold Brook in Lamoille County, Vermont. It was built in 1971, so it is 54 years old, younger than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,500 vehicles a day, roughly 2% of them trucks, projected to reach 1,575 by 2029. The structure is 59 ft (18 m) long and 25 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesC2007
CrossesGold Brook
Location0.2 MI to JCT W VT100
StateVermont
Coordinates44.44227, -72.69816
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating97 US tons
Inventory rating58 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length59 ft (18 m)
Longest span57 ft (17.4 m)
Deck width25 ft (7.5 m)
Roadway width22 ft (6.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2019)
Projected traffic1,575 by 2029
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$556,000 (2020 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was C2007 over Gold Brook built?

It was built in 1971, making it 54 years old in 2025.

What condition is C2007 over Gold Brook in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does C2007 over Gold Brook carry?

About 1,500 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is C2007 over Gold Brook?

The structure is 59 ft (18 m) long with a longest span of 57 ft (17.4 m) and a deck 25 ft wide.

Who owns C2007 over Gold Brook?

It is owned by the Town or Township Highway Agency.