US Bridges

C3012 over Morrill Brook

FairPosted for load

Caledonia County, Vermont · 0.1 MI to JCT W CL3 TH26 · Structure no. 100315000503151

Built
1949
76 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
52 ft
1 main span
Daily traffic
200
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

C3012 over Morrill Brook is a steel stringer/multi-beam or girder carrying C3012 over Morrill Brook in Caledonia County, Vermont. It was built in 1949, so it is 76 years old, older than the Vermont average of 60.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 200 vehicles a day, roughly 2% of them trucks, projected to reach 210 by 2029. The structure is 52 ft (15.8 m) long and 22 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesC3012
CrossesMorrill Brook
Location0.1 MI to JCT W CL3 TH26
StateVermont
Coordinates44.48396, -72.2919
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating22 US tons
Inventory rating13 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length52 ft (15.8 m)
Longest span50 ft (15.2 m)
Deck width22 ft (6.8 m)
Roadway width20 ft (6.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2019)
Projected traffic210 by 2029
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$691,000 (2020 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was C3012 over Morrill Brook built?

It was built in 1949, making it 76 years old in 2025.

What condition is C3012 over Morrill Brook in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does C3012 over Morrill Brook carry?

About 200 vehicles per day (2019 count), of which roughly 2% are trucks.

How long is C3012 over Morrill Brook?

The structure is 52 ft (15.8 m) long with a longest span of 50 ft (15.2 m) and a deck 22 ft wide.

Who owns C3012 over Morrill Brook?

It is owned by the Town or Township Highway Agency.