Route 85 over Spring Gut Creek

Poor

St. Croix Island, U.S. Virgin Islands · Route 85 · Structure no. SPRING GUT

Built
1904
121 years old
Condition
Poor
inspected February 2024
Type
Girder and Floorbeam System
Steel
Length
23 ft
1 main span
Daily traffic
100
2019 count
Owner
State
State Highway Agency

About this bridge

Route 85 over Spring Gut Creek is a steel girder and floorbeam system carrying Route 85 over Spring Gut Creek in St. Croix Island, U.S. Virgin Islands. It was built in 1904, so it is 121 years old, older than the U.S. Virgin Islands average of 51.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: open, posting recommended but not legally implemented.

It carries about 100 vehicles a day, projected to reach 120 by 2029. The structure is 23 ft (7 m) long and 19 ft wide.

CarriesRoute 85
CrossesSpring Gut Creek
LocationRoute 85
RouteCounty Highway 0
Coordinates17.74103, -64.69233
Functional classUrban Collector

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck4 PoorAdvanced section loss, deterioration, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, posting recommended but not legally implemented
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating12 US tons
Inventory rating6.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length23 ft (7 m)
Longest span19 ft (5.8 m)
Deck width19 ft (5.8 m)
Roadway width17 ft (5.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2019)
Projected traffic120 by 2029
Trucks—
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$915,000 (2022 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Route 85 over Spring Gut Creek built?

It was built in 1904, making it 121 years old in 2025.

What condition is Route 85 over Spring Gut Creek in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in February 2024.

How much traffic does Route 85 over Spring Gut Creek carry?

About 100 vehicles per day (2019 count).

How long is Route 85 over Spring Gut Creek?

The structure is 23 ft (7 m) long with a longest span of 19 ft (5.8 m) and a deck 19 ft wide.

Who owns Route 85 over Spring Gut Creek?

It is owned by the State Highway Agency.