Nimmo Parkway over West Neck Creek
GoodVirginia Beach city, Virginia · .8MI FR 165/1.8MI to 615 · Structure no. 000000000027067
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,602 ft
- 18 main spans
- Daily traffic
- 25,000
- 2012 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Nimmo Parkway over West Neck Creek is a prestressed concrete stringer/multi-beam or girder carrying Nimmo Parkway over West Neck Creek in Virginia Beach city, Virginia. It was built in 2014, so it is 11 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25,000 vehicles a day, roughly 1% of them trucks, projected to reach 50,000 by 2042. The structure is 1,602 ft (488.3 m) long and 105 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nimmo Parkway over West Neck Creek built?
It was built in 2014, making it 11 years old in 2025.
What condition is Nimmo Parkway over West Neck Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Nimmo Parkway over West Neck Creek carry?
About 25,000 vehicles per day (2012 count), of which roughly 1% are trucks.
How long is Nimmo Parkway over West Neck Creek?
The structure is 1,602 ft (488.3 m) long with a longest span of 89 ft (27.1 m) and a deck 105 ft wide.
Who owns Nimmo Parkway over West Neck Creek?
It is owned by the City or Municipal Highway Agency.