US Bridges

Route 0011 over Plum Creek

Good

Radford city, Virginia · O.85 Mi. from Montg. Cl. · Structure no. 000000000021271

Built
2002
23 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
133 ft
1 main span
Daily traffic
5,399
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Route 0011 over Plum Creek is a steel stringer/multi-beam or girder carrying Route 0011 over Plum Creek in Radford city, Virginia. It was built in 2002, so it is 23 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,399 vehicles a day, projected to reach 6,020 by 2042. The structure is 133 ft (40.6 m) long and 47 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRoute 0011
CrossesPlum Creek
LocationO.85 Mi. from Montg. Cl.
RouteU.S. Route 11
Coordinates37.13245, -80.52917
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59 US tons
Inventory rating46 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length133 ft (40.6 m)
Longest span133 ft (40.6 m)
Deck width47 ft (14.2 m)
Roadway width43 ft (13.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,399 (2022)
Projected traffic6,020 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Route 0011 over Plum Creek built?

It was built in 2002, making it 23 years old in 2025.

What condition is Route 0011 over Plum Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Route 0011 over Plum Creek carry?

About 5,399 vehicles per day (2022 count).

How long is Route 0011 over Plum Creek?

The structure is 133 ft (40.6 m) long with a longest span of 133 ft (40.6 m) and a deck 47 ft wide.

Who owns Route 0011 over Plum Creek?

It is owned by the City or Municipal Highway Agency.