Hrcp Ebl over Newmarket Creek
GoodNewport News city, Virginia · 0.90 to 143/1.23 to Bigbl · Structure no. 000000000026128
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 51 ft
- 1 main span
- Daily traffic
- 9,866
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Hrcp Ebl over Newmarket Creek is a steel stringer/multi-beam or girder carrying Hrcp Ebl over Newmarket Creek in Newport News city, Virginia. It was built in 2003, so it is 22 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,866 vehicles a day, projected to reach 14,406 by 2045. The structure is 51 ft (15.5 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hrcp Ebl over Newmarket Creek built?
It was built in 2003, making it 22 years old in 2025.
What condition is Hrcp Ebl over Newmarket Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Hrcp Ebl over Newmarket Creek carry?
About 9,866 vehicles per day (2022 count).
How long is Hrcp Ebl over Newmarket Creek?
The structure is 51 ft (15.5 m) long with a longest span of 51 ft (15.5 m) and a deck 52 ft wide.
Who owns Hrcp Ebl over Newmarket Creek?
It is owned by the City or Municipal Highway Agency.