US Bridges

Route 29 Bus. over Stadium Road

Good

Lynchburg city, Virginia · 1.86-NCL LYNCH/2.19-RT128 · Structure no. 000000000020529

Built
1994
31 years old
Condition
Good
inspected January 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
112 ft
1 main span
Daily traffic
37,337
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Route 29 Bus. over Stadium Road is a steel stringer/multi-beam or girder carrying Route 29 Bus. over Stadium Road in Lynchburg city, Virginia. It was built in 1994, so it is 31 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 37,337 vehicles a day, projected to reach 37,588 by 2045. The structure is 112 ft (34.1 m) long and 75 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRoute 29 Bus.
CrossesStadium Road
Location1.86-NCL LYNCH/2.19-RT128
RouteU.S. Route 29
Coordinates37.39378, -79.15739
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating69 US tons
Inventory rating53 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length112 ft (34.1 m)
Longest span112 ft (34.1 m)
Deck width75 ft (22.9 m)
Roadway width69 ft (21.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic37,337 (2022)
Projected traffic37,588 by 2045
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Route 29 Bus. over Stadium Road built?

It was built in 1994, making it 31 years old in 2025.

What condition is Route 29 Bus. over Stadium Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does Route 29 Bus. over Stadium Road carry?

About 37,337 vehicles per day (2022 count).

How long is Route 29 Bus. over Stadium Road?

The structure is 112 ft (34.1 m) long with a longest span of 112 ft (34.1 m) and a deck 75 ft wide.

Who owns Route 29 Bus. over Stadium Road?

It is owned by the City or Municipal Highway Agency.