South Main Street over Pumpkin Creek
GoodDanville city, Virginia · 0.40 COLLPRKDR-0.10 1174 · Structure no. 000000000026743
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected July 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 122 ft
- 3 main spans
- Daily traffic
- 10,905
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
South Main Street over Pumpkin Creek is a prestressed concrete box beam or girders - multiple carrying South Main Street over Pumpkin Creek in Danville city, Virginia. It was built in 2002, so it is 23 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,905 vehicles a day, projected to reach 12,159 by 2042. The structure is 122 ft (37.2 m) long and 96 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was South Main Street over Pumpkin Creek built?
It was built in 2002, making it 23 years old in 2025.
What condition is South Main Street over Pumpkin Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does South Main Street over Pumpkin Creek carry?
About 10,905 vehicles per day (2022 count).
How long is South Main Street over Pumpkin Creek?
The structure is 122 ft (37.2 m) long with a longest span of 40 ft (12.2 m) and a deck 96 ft wide.
Who owns South Main Street over Pumpkin Creek?
It is owned by the City or Municipal Highway Agency.