Jeb Stuart HWY Wbl over Sf Holstn Rv RTE 711 N&w
GoodWashington County, Virginia · 6.76 FR R11 & 3.85 to R91 · Structure no. 000000000031149
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 474 ft
- 2 main spans
- Daily traffic
- 2,955
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Jeb Stuart HWY Wbl over Sf Holstn Rv RTE 711 N&w is a steel continuous stringer/multi-beam or girder carrying Jeb Stuart HWY Wbl over Sf Holstn Rv RTE 711 N&w in Washington County, Virginia. It was built in 2023, so it is 2 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,955 vehicles a day, projected to reach 4,316 by 2045. The structure is 474 ft (144.5 m) long and 33 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Jeb Stuart HWY Wbl over Sf Holstn Rv RTE 711 N&w built?
It was built in 2023, making it 2 years old in 2025.
What condition is Jeb Stuart HWY Wbl over Sf Holstn Rv RTE 711 N&w in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Jeb Stuart HWY Wbl over Sf Holstn Rv RTE 711 N&w carry?
About 2,955 vehicles per day (2022 count).
How long is Jeb Stuart HWY Wbl over Sf Holstn Rv RTE 711 N&w?
The structure is 474 ft (144.5 m) long with a longest span of 234 ft (71.3 m) and a deck 33 ft wide.
Who owns Jeb Stuart HWY Wbl over Sf Holstn Rv RTE 711 N&w?
It is owned by the State Highway Agency.