US Bridges

Ramp Hrs over I-95 Southbound

Good

Stafford County, Virginia · 14.2M SPOTSY-1.4M Pw Cl · Structure no. 000000000029889

Built
2023
2 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
597 ft
3 main spans
Daily traffic
3,000
2022 count
Owner
State
State Highway Agency

About this bridge

Ramp Hrs over I-95 Southbound is a steel continuous stringer/multi-beam or girder carrying Ramp Hrs over I-95 Southbound in Stafford County, Virginia. It was built in 2023, so it is 2 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,000 vehicles a day, projected to reach 4,500 by 2042. The structure is 597 ft (181.9 m) long and 38 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesRamp Hrs
CrossesI-95 Southbound
Location14.2M SPOTSY-1.4M Pw Cl
RouteInterstate 0
Coordinates38.50286, -77.37964
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86 US tons
Inventory rating66.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length597 ft (181.9 m)
Longest span247 ft (75.3 m)
Deck width38 ft (11.5 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,000 (2022)
Projected traffic4,500 by 2042
Trucks—
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed98.8 mi (159 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp Hrs over I-95 Southbound built?

It was built in 2023, making it 2 years old in 2025.

What condition is Ramp Hrs over I-95 Southbound in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Ramp Hrs over I-95 Southbound carry?

About 3,000 vehicles per day (2022 count).

How long is Ramp Hrs over I-95 Southbound?

The structure is 597 ft (181.9 m) long with a longest span of 247 ft (75.3 m) and a deck 38 ft wide.

Who owns Ramp Hrs over I-95 Southbound?

It is owned by the State Highway Agency.