US Bridges

EB Ramp to Parkway over Pr. Wm. Co. Parkway

Good

Prince William County, Virginia · 00.20 1781 / 00.18 3000 · Structure no. 000000000023558

Built
1992
33 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
196 ft
2 main spans
Daily traffic
5,089
2022 count
Owner
State
State Highway Agency

About this bridge

EB Ramp to Parkway over Pr. Wm. Co. Parkway is a steel continuous stringer/multi-beam or girder carrying EB Ramp to Parkway over Pr. Wm. Co. Parkway in Prince William County, Virginia. It was built in 1992, so it is 33 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,089 vehicles a day, roughly 4% of them trucks, projected to reach 5,675 by 2042. The structure is 196 ft (59.7 m) long and 23 ft wide.

CarriesEB Ramp to Parkway
CrossesPr. Wm. Co. Parkway
Location00.20 1781 / 00.18 3000
Coordinates38.6546, -77.28666
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.4 US tons
Inventory rating40.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length196 ft (59.7 m)
Longest span101 ft (30.8 m)
Deck width23 ft (7.1 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,089 (2022)
Projected traffic5,675 by 2042
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$210 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was EB Ramp to Parkway over Pr. Wm. Co. Parkway built?

It was built in 1992, making it 33 years old in 2025.

What condition is EB Ramp to Parkway over Pr. Wm. Co. Parkway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does EB Ramp to Parkway over Pr. Wm. Co. Parkway carry?

About 5,089 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is EB Ramp to Parkway over Pr. Wm. Co. Parkway?

The structure is 196 ft (59.7 m) long with a longest span of 101 ft (30.8 m) and a deck 23 ft wide.

Who owns EB Ramp to Parkway over Pr. Wm. Co. Parkway?

It is owned by the State Highway Agency.