US Bridges

RTE 58 Ebl Bypass over Route 29 Business

Good

Pittsylvania County, Virginia · .20 RT-1141/ .40 Rt 1156 · Structure no. 000000000026283

Built
2004
21 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
267 ft
2 main spans
Daily traffic
3,003
2022 count
Owner
State
State Highway Agency

About this bridge

RTE 58 Ebl Bypass over Route 29 Business is a steel continuous stringer/multi-beam or girder carrying RTE 58 Ebl Bypass over Route 29 Business in Pittsylvania County, Virginia. It was built in 2004, so it is 21 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,003 vehicles a day, roughly 1% of them trucks, projected to reach 4,384 by 2042. The structure is 267 ft (81.4 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRTE 58 Ebl Bypass
CrossesRoute 29 Business
Location.20 RT-1141/ .40 Rt 1156
RouteU.S. Route 58
Coordinates36.54173, -79.46545
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating46 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length267 ft (81.4 m)
Longest span134 ft (40.8 m)
Deck width58 ft (17.8 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,003 (2022)
Projected traffic4,384 by 2042
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE 58 Ebl Bypass over Route 29 Business built?

It was built in 2004, making it 21 years old in 2025.

What condition is RTE 58 Ebl Bypass over Route 29 Business in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does RTE 58 Ebl Bypass over Route 29 Business carry?

About 3,003 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is RTE 58 Ebl Bypass over Route 29 Business?

The structure is 267 ft (81.4 m) long with a longest span of 134 ft (40.8 m) and a deck 58 ft wide.

Who owns RTE 58 Ebl Bypass over Route 29 Business?

It is owned by the State Highway Agency.