Merrimac Road /657 over Slate Creek
GoodPosted for loadMontgomery County, Virginia · 0.00-RTE 808;0.01-RTE 701 · Structure no. 000000000012285
- Built
- 1932
- 93 years old, rebuilt 1999
- Condition
- Good
- inspected September 2023
- Type
- Slab
- Wood or Timber
- Length
- 24 ft
- 1 main span
- Daily traffic
- 3,611
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
Merrimac Road /657 over Slate Creek is a wood or timber slab carrying Merrimac Road /657 over Slate Creek in Montgomery County, Virginia. It was built in 1932 and reconstructed in 1999, so it is 93 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 3,611 vehicles a day, projected to reach 4,496 by 2045. The structure is 24 ft (7.3 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Merrimac Road /657 over Slate Creek built?
It was built in 1932, making it 93 years old in 2025. It was reconstructed in 1999.
What condition is Merrimac Road /657 over Slate Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Merrimac Road /657 over Slate Creek carry?
About 3,611 vehicles per day (2019 count).
How long is Merrimac Road /657 over Slate Creek?
The structure is 24 ft (7.3 m) long with a longest span of 22 ft (6.7 m) and a deck 24 ft wide.
Who owns Merrimac Road /657 over Slate Creek?
It is owned by the State Highway Agency.