US Bridges

Church Road over W&od Hike & Bike Trail

Good

Loudoun County, Virginia · 00.39FR28/00.54TO637 · Structure no. 000000000026509

Built
2006
19 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
63 ft
1 main span
Daily traffic
22,669
2022 count
Owner
State
State Highway Agency

About this bridge

Church Road over W&od Hike & Bike Trail is a prestressed concrete stringer/multi-beam or girder carrying Church Road over W&od Hike & Bike Trail in Loudoun County, Virginia. It was built in 2006, so it is 19 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22,669 vehicles a day, roughly 1% of them trucks, projected to reach 33,097 by 2042. The structure is 63 ft (19.2 m) long and 95 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesChurch Road
CrossesW&od Hike & Bike Trail
Location00.39FR28/00.54TO637
RouteCounty Highway 625
Coordinates39.00522, -77.42789
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating58.4 US tons
Inventory rating45.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length63 ft (19.2 m)
Longest span61 ft (18.6 m)
Deck width95 ft (29 m)
Roadway width70 ft (21.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,669 (2022)
Projected traffic33,097 by 2042
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesPedestrian / bicycle
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$2.5 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Church Road over W&od Hike & Bike Trail built?

It was built in 2006, making it 19 years old in 2025.

What condition is Church Road over W&od Hike & Bike Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Church Road over W&od Hike & Bike Trail carry?

About 22,669 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Church Road over W&od Hike & Bike Trail?

The structure is 63 ft (19.2 m) long with a longest span of 61 ft (18.6 m) and a deck 95 ft wide.

Who owns Church Road over W&od Hike & Bike Trail?

It is owned by the State Highway Agency.