US Bridges

Pouncey Tract Road over Route I-64

Good

Henrico County, Virginia · 0.41 FR 250 & 0.64 Kain · Structure no. 000000000026671

Built
2008
17 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
341 ft
2 main spans
Daily traffic
11,396
2022 count
Owner
State
State Highway Agency

About this bridge

Pouncey Tract Road over Route I-64 is a steel continuous stringer/multi-beam or girder carrying Pouncey Tract Road over Route I-64 in Henrico County, Virginia. It was built in 2008, so it is 17 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,396 vehicles a day, roughly 1% of them trucks, projected to reach 12,707 by 2045. The structure is 341 ft (103.9 m) long and 82 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesPouncey Tract Road
CrossesRoute I-64
Location0.41 FR 250 & 0.64 Kain
RouteState Highway 271
Coordinates37.65703, -77.61174
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating96 US tons
Inventory rating74.1 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length341 ft (103.9 m)
Longest span171 ft (52 m)
Deck width82 ft (25.1 m)
Roadway width53 ft (16.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,396 (2022)
Projected traffic12,707 by 2045
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$900 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pouncey Tract Road over Route I-64 built?

It was built in 2008, making it 17 years old in 2025.

What condition is Pouncey Tract Road over Route I-64 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Pouncey Tract Road over Route I-64 carry?

About 11,396 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Pouncey Tract Road over Route I-64?

The structure is 341 ft (103.9 m) long with a longest span of 171 ft (52 m) and a deck 82 ft wide.

Who owns Pouncey Tract Road over Route I-64?

It is owned by the State Highway Agency.