US Bridges

EB Rmp Tovaden DR over Shoulder / Fill

Good

Fairfax County, Virginia · 0.01FR66 0.01TOVADEN · Structure no. 000000000031310

Built
2022
3 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
369 ft
3 main spans
Daily traffic
1,600
2021 count
Owner
State
State Highway Agency

About this bridge

EB Rmp Tovaden DR over Shoulder / Fill is a concrete stringer/multi-beam or girder carrying EB Rmp Tovaden DR over Shoulder / Fill in Fairfax County, Virginia. It was built in 2022, so it is 3 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,600 vehicles a day, projected to reach 1,760 by 2040. The structure is 369 ft (112.5 m) long and 25 ft wide.

CarriesEB Rmp Tovaden DR
CrossesShoulder / Fill
Location0.01FR66 0.01TOVADEN
RouteInterstate 6731
Coordinates38.87674, -77.27621
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating94.6 US tons
Inventory rating62.1 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3 (+2 approach)
Design loadHL 93
Structure length369 ft (112.5 m)
Longest span105 ft (32 m)
Deck width25 ft (7.6 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deck99 ft (30.2 m)

Traffic and service

Average daily traffic1,600 (2021)
Projected traffic1,760 by 2040
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was EB Rmp Tovaden DR over Shoulder / Fill built?

It was built in 2022, making it 3 years old in 2025.

What condition is EB Rmp Tovaden DR over Shoulder / Fill in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does EB Rmp Tovaden DR over Shoulder / Fill carry?

About 1,600 vehicles per day (2021 count).

How long is EB Rmp Tovaden DR over Shoulder / Fill?

The structure is 369 ft (112.5 m) long with a longest span of 105 ft (32 m) and a deck 25 ft wide.

Who owns EB Rmp Tovaden DR over Shoulder / Fill?

It is owned by the State Highway Agency and maintained by the Private (other than railroad).