US Bridges

Reston Parkway over W & Od Hike & Bike Trail

Good

Fairfax County, Virginia · 00.10FR675/00.75TO606 · Structure no. 000000000025681

Built
1998
27 years old
Condition
Good
inspected December 2024
Type
Arch - Deck
Concrete
Length
60 ft
1 main span
Daily traffic
21,420
2022 count
Owner
State
State Highway Agency

About this bridge

Reston Parkway over W & Od Hike & Bike Trail is a concrete arch - deck carrying Reston Parkway over W & Od Hike & Bike Trail in Fairfax County, Virginia. It was built in 1998, so it is 27 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 21,420 vehicles a day, projected to reach 25,246 by 2042. The structure is 60 ft (18.3 m) long and 135 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesReston Parkway
CrossesW & Od Hike & Bike Trail
Location00.10FR675/00.75TO606
RouteCounty Highway 602
Coordinates38.95688, -77.35492
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89.8 US tons
Inventory rating69.2 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length60 ft (18.3 m)
Longest span60 ft (18.3 m)
Deck width135 ft (41.1 m)
Roadway width98 ft (29.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic21,420 (2022)
Projected traffic25,246 by 2042
Trucks0%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesPedestrian / bicycle
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$250 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Reston Parkway over W & Od Hike & Bike Trail built?

It was built in 1998, making it 27 years old in 2025.

What condition is Reston Parkway over W & Od Hike & Bike Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Reston Parkway over W & Od Hike & Bike Trail carry?

About 21,420 vehicles per day (2022 count).

How long is Reston Parkway over W & Od Hike & Bike Trail?

The structure is 60 ft (18.3 m) long with a longest span of 60 ft (18.3 m) and a deck 135 ft wide.

Who owns Reston Parkway over W & Od Hike & Bike Trail?

It is owned by the State Highway Agency.