Harry Byrd Hwy-Ebl over NS Railway
PoorClarke County, Virginia · 0.80 to 340 -0.75 to 7BUS · Structure no. 000000000005376
- Built
- 1975
- 50 years old
- Condition
- Poor
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 152 ft
- 3 main spans
- Daily traffic
- 17,702
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Harry Byrd Hwy-Ebl over NS Railway is a steel stringer/multi-beam or girder carrying Harry Byrd Hwy-Ebl over NS Railway in Clarke County, Virginia. It was built in 1975, so it is 50 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 17,702 vehicles a day, roughly 5% of them trucks, projected to reach 16,955 by 2042. The structure is 152 ft (46.3 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Harry Byrd Hwy-Ebl over NS Railway built?
It was built in 1975, making it 50 years old in 2025.
What condition is Harry Byrd Hwy-Ebl over NS Railway in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in September 2024.
How much traffic does Harry Byrd Hwy-Ebl over NS Railway carry?
About 17,702 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Harry Byrd Hwy-Ebl over NS Railway?
The structure is 152 ft (46.3 m) long with a longest span of 52 ft (15.8 m) and a deck 40 ft wide.
Who owns Harry Byrd Hwy-Ebl over NS Railway?
It is owned by the State Highway Agency.