Buford Road over NS Railway
PoorChesterfield County, Virginia · .49 FR 686 & .08 to 718 · Structure no. 000000000005330
- Built
- 1983
- 42 years old
- Condition
- Poor
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 153 ft
- 3 main spans
- Daily traffic
- 11,661
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Buford Road over NS Railway is a steel stringer/multi-beam or girder carrying Buford Road over NS Railway in Chesterfield County, Virginia. It was built in 1983, so it is 42 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 11,661 vehicles a day, projected to reach 13,002 by 2045. The structure is 153 ft (46.5 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Buford Road over NS Railway built?
It was built in 1983, making it 42 years old in 2025.
What condition is Buford Road over NS Railway in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in November 2024.
How much traffic does Buford Road over NS Railway carry?
About 11,661 vehicles per day (2022 count).
How long is Buford Road over NS Railway?
The structure is 153 ft (46.5 m) long with a longest span of 51 ft (15.5 m) and a deck 42 ft wide.
Who owns Buford Road over NS Railway?
It is owned by the State Highway Agency.