US Bridges

Rte. 58 Bus. over Rte. 58 Bypass

Good

Carroll County, Virginia · 0.08 Route 669 · Structure no. 000000000026317

Built
2010
15 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
197 ft
2 main spans
Daily traffic
2,203
2022 count
Owner
State
State Highway Agency

About this bridge

Rte. 58 Bus. over Rte. 58 Bypass is a steel continuous stringer/multi-beam or girder carrying Rte. 58 Bus. over Rte. 58 Bypass in Carroll County, Virginia. It was built in 2010, so it is 15 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,203 vehicles a day, roughly 1% of them trucks, projected to reach 2,456 by 2042. The structure is 197 ft (60 m) long and 47 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRte. 58 Bus.
CrossesRte. 58 Bypass
Location0.08 Route 669
RouteU.S. Route 58
Coordinates36.75906, -80.69222
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57 US tons
Inventory rating44 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length197 ft (60 m)
Longest span96 ft (29.3 m)
Deck width47 ft (14.2 m)
Roadway width43 ft (13.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,203 (2022)
Projected traffic2,456 by 2042
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Rte. 58 Bus. over Rte. 58 Bypass built?

It was built in 2010, making it 15 years old in 2025.

What condition is Rte. 58 Bus. over Rte. 58 Bypass in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Rte. 58 Bus. over Rte. 58 Bypass carry?

About 2,203 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Rte. 58 Bus. over Rte. 58 Bypass?

The structure is 197 ft (60 m) long with a longest span of 96 ft (29.3 m) and a deck 47 ft wide.

Who owns Rte. 58 Bus. over Rte. 58 Bypass?

It is owned by the State Highway Agency.