SR-79EBL 31st St. over UPRR Rail Yards
FairWeber County, Utah · 0.5 MI.E.31st St.Intchg. · Structure no. 2C 314
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 419 ft
- 5 main spans
- Daily traffic
- 23,440
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
SR-79EBL 31st St. over UPRR Rail Yards is a steel stringer/multi-beam or girder carrying SR-79EBL 31st St. over UPRR Rail Yards in Weber County, Utah. It was built in 1960, so it is 65 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 23,440 vehicles a day, roughly 25% of them trucks, projected to reach 29,300 by 2034. The structure is 419 ft (127.7 m) long and 33 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-79EBL 31st St. over UPRR Rail Yards built?
It was built in 1960, making it 65 years old in 2025.
What condition is SR-79EBL 31st St. over UPRR Rail Yards in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does SR-79EBL 31st St. over UPRR Rail Yards carry?
About 23,440 vehicles per day (2014 count), of which roughly 25% are trucks.
How long is SR-79EBL 31st St. over UPRR Rail Yards?
The structure is 419 ft (127.7 m) long with a longest span of 115 ft (35.1 m) and a deck 33 ft wide.
Who owns SR-79EBL 31st St. over UPRR Rail Yards?
It is owned by the State Highway Agency.