US Bridges

City Street over Willard Canal

GoodPosted for load

Weber County, Utah · 1300 West 400 North · Structure no. 057046E

Built
1962
63 years old
Condition
Good
inspected April 2024
Type
Culvert
Concrete Continuous
Length
21 ft
2 main spans
Daily traffic
1,512
2014 count
Owner
City
City or Municipal Highway Agency

About this bridge

City Street over Willard Canal is a concrete continuous culvert carrying City Street over Willard Canal in Weber County, Utah. It was built in 1962, so it is 63 years old, older than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 1,512 vehicles a day, roughly 4% of them trucks, projected to reach 1,837 by 2034. The structure is 21 ft (6.3 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCity Street
CrossesWillard Canal
Location1300 West 400 North
RouteCity Street 0
StateUtah
Coordinates41.26772, -112.01322
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.2 US tons
Inventory rating20.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadH 15
Structure length21 ft (6.3 m)
Longest span9 ft (2.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,512 (2014)
Projected traffic1,837 by 2034
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was City Street over Willard Canal built?

It was built in 1962, making it 63 years old in 2025.

What condition is City Street over Willard Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does City Street over Willard Canal carry?

About 1,512 vehicles per day (2014 count), of which roughly 4% are trucks.

How long is City Street over Willard Canal?

The structure is 21 ft (6.3 m) long with a longest span of 9 ft (2.8 m).

Who owns City Street over Willard Canal?

It is owned by the City or Municipal Highway Agency.