US Bridges

Camino Del Rio RD over North Creek

Fair

Washington County, Utah · Koleb Rd. Oer North Creek · Structure no. 053081D

Built
2014
11 years old
Condition
Fair
inspected February 2024
Type
Slab
Concrete
Length
90 ft
2 main spans
Daily traffic
50
2015 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Camino Del Rio RD over North Creek is a concrete slab carrying Camino Del Rio RD over North Creek in Washington County, Utah. It was built in 2014, so it is 11 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, projected to reach 63 by 2030. The structure is 90 ft (27.4 m) long and 55 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCamino Del Rio RD
CrossesNorth Creek
LocationKoleb Rd. Oer North Creek
RouteCounty Highway 3207
StateUtah
Coordinates37.20528, -113.17173
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating42.9 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length90 ft (27.4 m)
Longest span39 ft (11.8 m)
Deck width55 ft (16.8 m)
Roadway width54 ft (16.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2015)
Projected traffic63 by 2030
Trucks0%
Lanes on structure2
Traffic directionHighway traffic not carried
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Camino Del Rio RD over North Creek built?

It was built in 2014, making it 11 years old in 2025.

What condition is Camino Del Rio RD over North Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Camino Del Rio RD over North Creek carry?

About 50 vehicles per day (2015 count).

How long is Camino Del Rio RD over North Creek?

The structure is 90 ft (27.4 m) long with a longest span of 39 ft (11.8 m) and a deck 55 ft wide.

Who owns Camino Del Rio RD over North Creek?

It is owned by the Town or Township Highway Agency.