US Bridges

Pathway-Storm Drn. over Dixie Drive

Fair

Washington County, Utah · At Dixie Dr. Interchange · Structure no. 053073E

Built
2012
13 years old
Condition
Fair
inspected February 2024
Type
Culvert
Concrete Continuous
Length
30 ft
2 main spans
Daily traffic
11,550
2010 count
Owner
City
City or Municipal Highway Agency

About this bridge

Pathway-Storm Drn. over Dixie Drive is a concrete continuous culvert carrying Pathway-Storm Drn. over Dixie Drive in Washington County, Utah. It was built in 2012, so it is 13 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 11,550 vehicles a day, roughly 10% of them trucks, projected to reach 14,440 by 2030. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 5 mi (8 km).

CarriesPathway-Storm Drn.
CrossesDixie Drive
LocationAt Dixie Dr. Interchange
RouteCity Street 3166
StateUtah
Coordinates37.07506, -113.5858
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating107.1 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHL 93
Structure length30 ft (9.1 m)
Longest span28 ft (8.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,550 (2010)
Projected traffic14,440 by 2030
Trucks10%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pathway-Storm Drn. over Dixie Drive built?

It was built in 2012, making it 13 years old in 2025.

What condition is Pathway-Storm Drn. over Dixie Drive in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Pathway-Storm Drn. over Dixie Drive carry?

About 11,550 vehicles per day (2010 count), of which roughly 10% are trucks.

How long is Pathway-Storm Drn. over Dixie Drive?

The structure is 30 ft (9.1 m) long with a longest span of 28 ft (8.5 m).

Who owns Pathway-Storm Drn. over Dixie Drive?

It is owned by the City or Municipal Highway Agency.