US Bridges

Highland Blvd. over WB Commuter Lane

Fair

Utah County, Utah · 6.0 Mi.E.Of Alpine Intchg · Structure no. 4D 850

Built
2012
13 years old
Condition
Fair
inspected February 2023
Type
Culvert
Concrete
Length
38 ft
1 main span
Daily traffic
2,500
2012 count
Owner
State
State Highway Agency

About this bridge

Highland Blvd. over WB Commuter Lane is a concrete culvert carrying Highland Blvd. over WB Commuter Lane in Utah County, Utah. It was built in 2012, so it is 13 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,500 vehicles a day, projected to reach 3,500 by 2034. The structure is 38 ft (11.6 m) long. If it were closed, the detour would be 5 mi (8 km).

CarriesHighland Blvd.
CrossesWB Commuter Lane
Location6.0 Mi.E.Of Alpine Intchg
RouteCity Street 2920
StateUtah
Coordinates40.43194, -111.82167
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating100.3 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length38 ft (11.6 m)
Longest span36 ft (11 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,500 (2012)
Projected traffic3,500 by 2034
Trucks—
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Highland Blvd. over WB Commuter Lane built?

It was built in 2012, making it 13 years old in 2025.

What condition is Highland Blvd. over WB Commuter Lane in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does Highland Blvd. over WB Commuter Lane carry?

About 2,500 vehicles per day (2012 count).

How long is Highland Blvd. over WB Commuter Lane?

The structure is 38 ft (11.6 m) long with a longest span of 36 ft (11 m).

Who owns Highland Blvd. over WB Commuter Lane?

It is owned by the State Highway Agency.