US Bridges

I-15 (SR-15) Sbl over 300 West Street

Fair

Utah County, Utah · In American Fork · Structure no. 3F 819

Built
2011
14 years old
Condition
Fair
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
120 ft
1 main span
Daily traffic
209,636
2023 count
Owner
State
State Highway Agency

About this bridge

I-15 (SR-15) Sbl over 300 West Street is a prestressed concrete stringer/multi-beam or girder carrying I-15 (SR-15) Sbl over 300 West Street in Utah County, Utah. It was built in 2011, so it is 14 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 209,636 vehicles a day, roughly 18% of them trucks, projected to reach 251,563 by 2043. The structure is 120 ft (36.6 m) long and 112 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-15 (SR-15) Sbl
Crosses300 West Street
LocationIn American Fork
RouteInterstate 15
StateUtah
Coordinates40.37298, -111.80775
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating89.9 US tons
Inventory rating47.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length120 ft (36.6 m)
Longest span115 ft (35.1 m)
Deck width112 ft (34.2 m)
Roadway width110 ft (33.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic209,636 (2023)
Projected traffic251,563 by 2043
Trucks18%
Lanes on structure6
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-15 (SR-15) Sbl over 300 West Street built?

It was built in 2011, making it 14 years old in 2025.

What condition is I-15 (SR-15) Sbl over 300 West Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does I-15 (SR-15) Sbl over 300 West Street carry?

About 209,636 vehicles per day (2023 count), of which roughly 18% are trucks.

How long is I-15 (SR-15) Sbl over 300 West Street?

The structure is 120 ft (36.6 m) long with a longest span of 115 ft (35.1 m) and a deck 112 ft wide.

Who owns I-15 (SR-15) Sbl over 300 West Street?

It is owned by the State Highway Agency.