INT.SR145 and Pon over UPRR and Uta Track
FairUtah County, Utah · 0.7MI.WEST of I-15 Int. · Structure no. 0F 787
- Built
- 2010
- 15 years old
- Condition
- Fair
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 204 ft
- 1 main span
- Daily traffic
- 47,664
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
INT.SR145 and Pon over UPRR and Uta Track is a prestressed concrete stringer/multi-beam or girder carrying INT.SR145 and Pon over UPRR and Uta Track in Utah County, Utah. It was built in 2010, so it is 15 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 47,664 vehicles a day, roughly 11% of them trucks, projected to reach 57,197 by 2037. The structure is 204 ft (62.3 m) long and 126 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was INT.SR145 and Pon over UPRR and Uta Track built?
It was built in 2010, making it 15 years old in 2025.
What condition is INT.SR145 and Pon over UPRR and Uta Track in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does INT.SR145 and Pon over UPRR and Uta Track carry?
About 47,664 vehicles per day (2017 count), of which roughly 11% are trucks.
How long is INT.SR145 and Pon over UPRR and Uta Track?
The structure is 204 ft (62.3 m) long with a longest span of 198 ft (60.2 m) and a deck 126 ft wide.
Who owns INT.SR145 and Pon over UPRR and Uta Track?
It is owned by the State Highway Agency.