US Bridges

SR-176 Vineyard over Uta Frontrunner

Good

Utah County, Utah · SR 176 over Frontrunner · Structure no. 0C1022

Built
2015
10 years old
Condition
Good
inspected January 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
227 ft
1 main span
Daily traffic
13,232
2021 count
Owner
State
State Highway Agency

About this bridge

SR-176 Vineyard over Uta Frontrunner is a steel stringer/multi-beam or girder carrying SR-176 Vineyard over Uta Frontrunner in Utah County, Utah. It was built in 2015, so it is 10 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,232 vehicles a day, roughly 25% of them trucks, projected to reach 15,878 by 2041. The structure is 227 ft (69.3 m) long and 58 ft wide.

CarriesSR-176 Vineyard
CrossesUta Frontrunner
LocationSR 176 over Frontrunner
RouteState Highway 176
StateUtah
Coordinates40.31072, -111.74898
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.1 US tons
Inventory rating45.3 US tons

Structure

MaterialSteel
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length227 ft (69.3 m)
Longest span223 ft (68 m)
Deck width58 ft (17.8 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,232 (2021)
Projected traffic15,878 by 2041
Trucks25%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad and waterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR-176 Vineyard over Uta Frontrunner built?

It was built in 2015, making it 10 years old in 2025.

What condition is SR-176 Vineyard over Uta Frontrunner in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does SR-176 Vineyard over Uta Frontrunner carry?

About 13,232 vehicles per day (2021 count), of which roughly 25% are trucks.

How long is SR-176 Vineyard over Uta Frontrunner?

The structure is 227 ft (69.3 m) long with a longest span of 223 ft (68 m) and a deck 58 ft wide.

Who owns SR-176 Vineyard over Uta Frontrunner?

It is owned by the State Highway Agency.