US Bridges

800 E. St. in Orem over Murdock Canal Trail

Good

Utah County, Utah · 800 East 1400 North Orem · Structure no. 049104E

Built
2012
13 years old
Condition
Good
inspected November 2023
Type
Culvert
Concrete
Length
27 ft
1 main span
Daily traffic
13,230
2010 count
Owner
City
City or Municipal Highway Agency

About this bridge

800 E. St. in Orem over Murdock Canal Trail is a concrete culvert carrying 800 E. St. in Orem over Murdock Canal Trail in Utah County, Utah. It was built in 2012, so it is 13 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: open, posting recommended but not legally implemented.

It carries about 13,230 vehicles a day, roughly 4% of them trucks, projected to reach 16,075 by 2030. The structure is 27 ft (8.2 m) long. If it were closed, the detour would be 3.1 mi (5 km).

Carries800 E. St. in Orem
CrossesMurdock Canal Trail
Location800 East 1400 North Orem
RouteCity Street 2946
StateUtah
Coordinates40.32283, -111.6768
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Culvert7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 23 months
Operating statusOpen, posting recommended but not legally implemented
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.7 US tons
Inventory rating35.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length27 ft (8.2 m)
Longest span24 ft (7.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,230 (2010)
Projected traffic16,075 by 2030
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 800 E. St. in Orem over Murdock Canal Trail built?

It was built in 2012, making it 13 years old in 2025.

What condition is 800 E. St. in Orem over Murdock Canal Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does 800 E. St. in Orem over Murdock Canal Trail carry?

About 13,230 vehicles per day (2010 count), of which roughly 4% are trucks.

How long is 800 E. St. in Orem over Murdock Canal Trail?

The structure is 27 ft (8.2 m) long with a longest span of 24 ft (7.2 m).

Who owns 800 E. St. in Orem over Murdock Canal Trail?

It is owned by the City or Municipal Highway Agency.