US Bridges

Orem Center Street over Carterville Road

Fair

Utah County, Utah · 1200 East Center St. Orem · Structure no. 049068F

Built
1982
43 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
125 ft
1 main span
Daily traffic
25,742
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

Orem Center Street over Carterville Road is a prestressed concrete stringer/multi-beam or girder carrying Orem Center Street over Carterville Road in Utah County, Utah. It was built in 1982, so it is 43 years old, older than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 25,742 vehicles a day, roughly 4% of them trucks, projected to reach 31,277 by 2033. The structure is 125 ft (38.2 m) long and 70 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesOrem Center Street
CrossesCarterville Road
Location1200 East Center St. Orem
RouteCity Street 2960
StateUtah
Coordinates40.29697, -111.66706
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.7 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length125 ft (38.2 m)
Longest span120 ft (36.5 m)
Deck width70 ft (21.4 m)
Roadway width52 ft (16 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,742 (2013)
Projected traffic31,277 by 2033
Trucks4%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Orem Center Street over Carterville Road built?

It was built in 1982, making it 43 years old in 2025.

What condition is Orem Center Street over Carterville Road in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Orem Center Street over Carterville Road carry?

About 25,742 vehicles per day (2013 count), of which roughly 4% are trucks.

How long is Orem Center Street over Carterville Road?

The structure is 125 ft (38.2 m) long with a longest span of 120 ft (36.5 m) and a deck 70 ft wide.

Who owns Orem Center Street over Carterville Road?

It is owned by the City or Municipal Highway Agency.