US Bridges

No Data Entered over No Data Entered

Good

Utah County, Utah · 14.15 Miles from HWY 6 · Structure no. 041908000020876

Built
2016
9 years old
Condition
Good
inspected August 2023
Type
Slab
Prestressed Concrete
Length
40 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

No Data Entered over No Data Entered is a prestressed concrete slab carrying No Data Entered over No Data Entered in Utah County, Utah. It was built in 2016, so it is 9 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 40 ft (12.2 m) long and 28 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesNo Data Entered
CrossesNo Data Entered
Location14.15 Miles from HWY 6
RouteFederal Lands Road 70029
StateUtah
Coordinates40.14044, -111.33992
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating65.4 US tons
Inventory rating50.7 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length40 ft (12.2 m)
Longest span39 ft (11.9 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was No Data Entered over No Data Entered built?

It was built in 2016, making it 9 years old in 2025.

What condition is No Data Entered over No Data Entered in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does No Data Entered over No Data Entered carry?

About 50 vehicles per day (latest count).

How long is No Data Entered over No Data Entered?

The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 28 ft wide.

Who owns No Data Entered over No Data Entered?

It is owned by the U.S. Forest Service.