US Bridges

No Data Entered over No Data Entered

Good

Utah County, Utah · No Data Entered · Structure no. 041802000003246

Built
2006
19 years old
Condition
Good
inspected November 2023
Type
Tee Beam
Prestressed Concrete
Length
42 ft
1 main span
Daily traffic
50
Owner
Federal
U.S. Forest Service

About this bridge

No Data Entered over No Data Entered is a prestressed concrete tee beam carrying No Data Entered over No Data Entered in Utah County, Utah. It was built in 2006, so it is 19 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 42 ft (12.8 m) long and 20 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesNo Data Entered
CrossesNo Data Entered
LocationNo Data Entered
RouteFederal Lands Road 70098
StateUtah
Coordinates40.45078, -111.66791
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating27.9 US tons
Inventory rating21.4 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length42 ft (12.8 m)
Longest span40 ft (12.2 m)
Deck width20 ft (6.1 m)
Roadway width18 ft (5.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (—)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was No Data Entered over No Data Entered built?

It was built in 2006, making it 19 years old in 2025.

What condition is No Data Entered over No Data Entered in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does No Data Entered over No Data Entered carry?

About 50 vehicles per day (latest count).

How long is No Data Entered over No Data Entered?

The structure is 42 ft (12.8 m) long with a longest span of 40 ft (12.2 m) and a deck 20 ft wide.

Who owns No Data Entered over No Data Entered?

It is owned by the U.S. Forest Service.