US Bridges

I-80 (SR-80) Ebl over Weber River

Fair

Summit County, Utah · Echo Interchange · Structure no. 2F 843

Built
2012
13 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
124 ft
1 main span
Daily traffic
6,011
2012 count
Owner
State
State Highway Agency

About this bridge

I-80 (SR-80) Ebl over Weber River is a prestressed concrete stringer/multi-beam or girder carrying I-80 (SR-80) Ebl over Weber River in Summit County, Utah. It was built in 2012, so it is 13 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,011 vehicles a day, roughly 33% of them trucks, projected to reach 7,513 by 2032. The structure is 124 ft (37.7 m) long and 63 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-80 (SR-80) Ebl
CrossesWeber River
LocationEcho Interchange
RouteInterstate 80
StateUtah
Coordinates40.96809, -111.43871
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.1 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length124 ft (37.7 m)
Longest span116 ft (35.5 m)
Deck width63 ft (19.1 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,011 (2012)
Projected traffic7,513 by 2032
Trucks33%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-80 (SR-80) Ebl over Weber River built?

It was built in 2012, making it 13 years old in 2025.

What condition is I-80 (SR-80) Ebl over Weber River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does I-80 (SR-80) Ebl over Weber River carry?

About 6,011 vehicles per day (2012 count), of which roughly 33% are trucks.

How long is I-80 (SR-80) Ebl over Weber River?

The structure is 124 ft (37.7 m) long with a longest span of 116 ft (35.5 m) and a deck 63 ft wide.

Who owns I-80 (SR-80) Ebl over Weber River?

It is owned by the State Highway Agency.