US Bridges

I-80 (SR-80) Ebl over Weber River

Fair

Summit County, Utah · .5 Mi.No.Of Coalville Int · Structure no. 2F 190

Built
1968
57 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
146 ft
2 main spans
Daily traffic
12,405
2014 count
Owner
State
State Highway Agency

About this bridge

I-80 (SR-80) Ebl over Weber River is a prestressed concrete stringer/multi-beam or girder carrying I-80 (SR-80) Ebl over Weber River in Summit County, Utah. It was built in 1968, so it is 57 years old, older than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,405 vehicles a day, roughly 38% of them trucks, projected to reach 15,507 by 2034. The structure is 146 ft (44.5 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-80 (SR-80) Ebl
CrossesWeber River
Location.5 Mi.No.Of Coalville Int
RouteInterstate 80
StateUtah
Coordinates40.91784, -111.40721
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.9 US tons
Inventory rating25 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length146 ft (44.5 m)
Longest span61 ft (18.5 m)
Deck width40 ft (12.1 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,405 (2014)
Projected traffic15,507 by 2034
Trucks38%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-80 (SR-80) Ebl over Weber River built?

It was built in 1968, making it 57 years old in 2025.

What condition is I-80 (SR-80) Ebl over Weber River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does I-80 (SR-80) Ebl over Weber River carry?

About 12,405 vehicles per day (2014 count), of which roughly 38% are trucks.

How long is I-80 (SR-80) Ebl over Weber River?

The structure is 146 ft (44.5 m) long with a longest span of 61 ft (18.5 m) and a deck 40 ft wide.

Who owns I-80 (SR-80) Ebl over Weber River?

It is owned by the State Highway Agency.