US Bridges

I-80EB (SR-80) over SR-32

Good

Summit County, Utah · At the Wanship Interchg. · Structure no. 2C1011

Built
2012
13 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
90 ft
1 main span
Daily traffic
6,402
2012 count
Owner
State
State Highway Agency

About this bridge

I-80EB (SR-80) over SR-32 is a steel stringer/multi-beam or girder carrying I-80EB (SR-80) over SR-32 in Summit County, Utah. It was built in 2012, so it is 13 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,402 vehicles a day, roughly 46% of them trucks, projected to reach 8,003 by 2032. The structure is 90 ft (27.5 m) long and 47 ft wide.

CarriesI-80EB (SR-80)
CrossesSR-32
LocationAt the Wanship Interchg.
RouteInterstate 80
StateUtah
Coordinates40.80838, -111.40795
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.3 US tons
Inventory rating39.2 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length90 ft (27.5 m)
Longest span87 ft (26.5 m)
Deck width47 ft (14.2 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,402 (2012)
Projected traffic8,003 by 2032
Trucks46%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkSTRAHNET connector

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-80EB (SR-80) over SR-32 built?

It was built in 2012, making it 13 years old in 2025.

What condition is I-80EB (SR-80) over SR-32 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does I-80EB (SR-80) over SR-32 carry?

About 6,402 vehicles per day (2012 count), of which roughly 46% are trucks.

How long is I-80EB (SR-80) over SR-32?

The structure is 90 ft (27.5 m) long with a longest span of 87 ft (26.5 m) and a deck 47 ft wide.

Who owns I-80EB (SR-80) over SR-32?

It is owned by the State Highway Agency.