County Road over Weber River Overflow Ch.
FairPosted for loadSummit County, Utah · 1.5 Miiles Nw. of Peoa · Structure no. 043001D
- Built
- 1948
- 77 years old, rebuilt 2005
- Condition
- Fair
- inspected June 2024
- Type
- Frame
- Concrete
- Length
- 43 ft
- 1 main span
- Daily traffic
- 2,350
- 2010 count
- Owner
- County
- County Highway Agency
About this bridge
County Road over Weber River Overflow Ch. is a concrete frame carrying County Road over Weber River Overflow Ch. in Summit County, Utah. It was built in 1948 and reconstructed in 2005, so it is 77 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 2,350 vehicles a day, roughly 4% of them trucks, projected to reach 2,855 by 2030. The structure is 43 ft (13.2 m) long and 43 ft wide. If it were closed, the detour would be 24.9 mi (40 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road over Weber River Overflow Ch. built?
It was built in 1948, making it 77 years old in 2025. It was reconstructed in 2005.
What condition is County Road over Weber River Overflow Ch. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does County Road over Weber River Overflow Ch. carry?
About 2,350 vehicles per day (2010 count), of which roughly 4% are trucks.
How long is County Road over Weber River Overflow Ch.?
The structure is 43 ft (13.2 m) long with a longest span of 22 ft (6.7 m) and a deck 43 ft wide.
Who owns County Road over Weber River Overflow Ch.?
It is owned by the County Highway Agency.