I-70 (SR-70) Wbl over Sevier River & Co. R
FairSevier County, Utah · 1.2 Mi.E.Of Sigurd Intchg · Structure no. 4F 489
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 223 ft
- 2 main spans
- Daily traffic
- 7,166
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-70 (SR-70) Wbl over Sevier River & Co. R is a prestressed concrete continuous stringer/multi-beam or girder carrying I-70 (SR-70) Wbl over Sevier River & Co. R in Sevier County, Utah. It was built in 1986, so it is 39 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,166 vehicles a day, roughly 36% of them trucks, projected to reach 8,599 by 2043. The structure is 223 ft (68 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-70 (SR-70) Wbl over Sevier River & Co. R built?
It was built in 1986, making it 39 years old in 2025.
What condition is I-70 (SR-70) Wbl over Sevier River & Co. R in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does I-70 (SR-70) Wbl over Sevier River & Co. R carry?
About 7,166 vehicles per day (2023 count), of which roughly 36% are trucks.
How long is I-70 (SR-70) Wbl over Sevier River & Co. R?
The structure is 223 ft (68 m) long with a longest span of 116 ft (35.3 m) and a deck 46 ft wide.
Who owns I-70 (SR-70) Wbl over Sevier River & Co. R?
It is owned by the State Highway Agency.